Project Saturn, Emirates Stadium
- COMPLETED WITHIN FIXED SEASONAL PROGRAMMES
- COMPLEX STRUCTURAL WORKS DELIVERED SAFELY
- ADDITIONAL CLUB LEVEL SEATING CREATED
Project Overview
Claremont delivered Project Saturn at Emirates Stadium, creating an additional row of Club Level seating around the stadium perimeter within an exceptionally constrained programme. The works included the removal and reinstatement of existing seating and services together with the installation of new structural steelwork and cantilevered framing to increase spectator capacity.
Delivered across two close seasons, the project demanded meticulous planning, complex logistics and flawless coordination to ensure every phase was completed before the stadium returned to operation.
Performance, Not Promises
Projects with immovable completion dates leave no margin for error. Through detailed planning, collaborative delivery and rigorous programme management, Claremont successfully delivered complex structural alterations within the narrow construction windows available between football seasons, ensuring the stadium was ready for the start of each new campaign.